Abstract


This research study focuses on biomass-based cogeneration power plants. Mechanisms have been adopted to promote and regulate project implementation of cogeneration power plants, to improve or increase their energy efficiency and to meet environmental standards, reducing both improve or increase their energy efficiency, and meet environmental standards, reducing local air pollution and CO2 emissions. This paper aims to identify the parameters to monitor and assess the improvement in energy efficiency and reduce CO2 emissions from cogeneration plants. A survey study was first conducted for ten sugarcane processing plants with SPP (10-90 MW) cogeneration plants in the central and northern regions of Thailand. The survey identified parameters that are used to monitor and control various plant operating conditions such as operating pressures, temperatures, and steam generation flow rates, including preventive maintenance plans to maximize the overall performance of the power plant. A field case study was then conducted for a 25 MW cogeneration power plant in Nakhon Sawan province. The case study involved analyzing the parameters used for monitoring and assessing the best practice operations of a co-generation power plant and evaluating the use of these parameters in analyzing the impacts on the energy efficiency and the CO2 emissions from the co-generation plant. The case study analysis showed that these parameters used for monitoring and controlling the operation of the co-generation power plants can also be used to monitor and assess the improvement in the energy efficiency of the power plants, and to assess the CO2 emission reductions achieved by the power plant.

Keywords


Co-generation power plant; CO2 emission; Energy efficiency; Parameter to monitor; Power plant monitoring

Full Text:

PDF

References


Ruamphol Biopower Company Limited. 2019. Cogeneration Power Plant Install Capacity 50 MW. Bagasse Fuel, Nakon Sawan, Thailand.

The United Nations Framework Convention on Climate Change (UNFCCC). 2015. Methodological tool determining the baseline efficiency of thermal or electric energy generation systems, Version 02.0. UNFCCC, Bonn, Germany.

Japanese Industry Standard (JIS), 1993.TJIS B 8222:1993. Land boilers-Heat balancing: Method Assessment Energy Efficiency of Boiler Systems. Japanese Standards Association, Japan.

The American Society of Mechanical Engineers (ASME), 2013. ASME PTC 4-2013. Fired Steam Generators Performance Test Code. ASME, New York.

The American Society for Testing and Materials (ASTM), 2010. Designation: C585-10. Standard Practice for inner and Outer Diameters of Thermal Insulation for Nominal Sizes of Pipe and Tubing. ASTM, West Conshohocken, USA.

The American Society for Testing and Materials (ASTM), 1995.Standard Practice for Determination of Heat Gain of Loss and the Surface Temperatures of Insulated Pipe and Equipment System by the Use of a Computer Program. (Designation: C680-89 Reapproved 1995); Case 2 Cylindrical Section, ASTM C 585 rigid and Flexible. ASTM, West Conshohocken, USA.

The United Nations Framework Convention on Climate Change (UNFCCC), 2015.Method Baseline CO2 Emission Such as Project Design Document from CDM –SSC-PDD – Version 03 With Method to Make of Clean Development Mechanism Project Design Document With Application of a Baseline and Monitoring Methodology.UNFCCC, Bonn, Germany.

The U.S. Occupational Safety and Health Administration (OSHA)., 2017. Regulation of Personal Protective Equipment. Sets A Limit of A Maximum Skin Temperature of 140°F (60°C) After Five Seconds of Exposure. [On-line serial], Retrieved May 5, 2019 from the World Wide Web: https://www.osha.gov/personal-protective-equipment/standards.

Niraj K. and P. Kruten. 2017. Exergy analysis of thermal power plant for full load and part load condition. International Journal of Advance Engineering and Research Development 4(6).

Yung C., 2015. Energy and exergy analyses of biomass cogeneration system. The Faculty of Engineering and Applied Science. University of Ontario Institute of Technology.

Mahlia T.M.I., Lim J.Y., Aditya L., Riayatsyah T.M.I., and Abas Nasruddin A.E.Pg, 2018. Methodology for implementing power plant efficiency standards for power generation: Potential emission reduction. Clean Technologies and Environmental Policy: 309–327.

Feng T.T., Gong X.L., Guo Y.H., Yang Y.S, and Dong J, 2019. Regulatory mechanism design of GHG emissions in the electric power industry in China. Energy Policy 131: 187-201.

Office of The Energy Regulatory Commission (ERC). 2019. Database License of Electricity Generation., Licensing Process., and Regulation Operation of Power Plants Since 2019 . [On-line serial], Retrieved May 20, 2019 from the World Wide Web: http://app04.erc.or.th/ELicense/Licenser/05_Reporting/504_ListLicensing_Columns_New.aspx?LicenseType=1

Energy Policy and Planning Office (EPPO). 2019. Statistics CO2 Emission of Power Plants Sector Since 1994 – 2018. [On-line serial], Retrieved August 10,2019 from the World Wide Web: http://www.eppo.go.th/index.php/en/en-energystatistics/co2-statistic.

Pollution Control Department (PCD). 2010. Emission Standard Control from Thermal Power Plants. [On-line serial], Retrieved August 20, 2019 from the World Wide Web: http://pcd.go.th/info_serv/reg_std_airsnd03.html#s1.

Office Natural Resources and Environmental Policy and Planning (ONEP). 2012. Environmental Impact Assessment of Thermal Power Plant Report and EIA Process. [On-line serial], Retrieved September 3, 2019 from the World Wide Web: https://eia.onep.go.th/monitor.php?action=y.

Parvez M. and O. Khan. 2019. Parametric simulation of biomass integrated gasification combined cycle (BIGCC) power plant using three different biomass material. Biomass Conversion and Biorefinery 10: 803–812.

Parvez M., 2017. Investigation on thermodynamic behavior of apple juice waste- and sugarcane bagasse gasified fuelled combined cycle power generation system. Biofuels 11(4): 1-7.

Gambini M., Vellini M., Stilo T., Manno M., and Bellocchi S, 2019. High-efficiency cogeneration systems: The case of the paper industry in Italy. Energies 12: 335.

Osueke C., Onokwai A., and Adeoye A, 2015. Energy and exergy analysis of a 75 MW steam power plant in Sapele (NIGERIA). International Journal of Innovative Research in Advanced Engineering 2(6).

Eke M.N., Onyejekwe D.C., Iloeje O.C., Ezekwe C.I., and Akpan P.U., 2018. Energy and exergy evaluation of a 220 MW thermal power plant. Nigerian Journal of Technology 37(1): 115-123.

Cengle Y.A. and M.A. Boles. 2006. Thermodynamics: an engineering approach, 15th Edition. McGraw-Hill, New York.

Patel T., and D. Patel. 2014. Energy analysis and efficiency assessment of water tube boiler. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) 11(3): 65-69.

Motokura M., Lee J., Kutani I., and Phoumin H, 2016. Improving emission regulation for coal-fired power plants in ASEAN. ERIA Research Project Report, No.02.

Sosa-Arnao J.H., and S.A. Nebra. 2011. First and second law to analyze the performance of Bagasse boilers. International Journal of Thermodynamic (IJOT) 14(2): 51-58.

Department of Industrial Works (DIW). 2018. Guideline to Optimizing the Efficiency of Very Small Biomass Power Plants (VSPP) 2018.Method to Monitor Performance Biomass Power Plants. Department of Industrial Works, Bangkok, Thailand.

Singh O.K., 2019. Exergy analysis of a grid – connected Bagasse-based cogeneration plant of sugar factory and exhaust heat utilization for running a cold storage. Renewable Energy 143: 149-163.

North American Insulation Manufacturers Association (NAIMA). 2019. 3E Plus Software for Assessment of Heat Loss Piping and Heat Loss of Wall Boiler. [On-line serial], Retrieved September 15, 2019, from the World Wide Web: https://insulationinstitute.org/tools-resources/.

The U.S. Department of Energy (DOE). 2019. Tool Assessment Performance Steam Turbine. [On-line serial], Retrieved September 20, 2019 from the World Wide Web: https://www4.eere.energy.gov/manufacturing/tech_deployment/amo_steam_tool/.